It is important for calibrating track and rebuilding existing railways to ensure safety and comfort. Track calibration repairs the existing distorted track centerline to match the smoothed recreated alignment, which may differ considerably from the originally designed track centerline. Identifying the boundaries of all the geometric elements including tangents, circular curves, and transition curves is the key problem. Existing methods recreate the horizontal alignment semi‐automatically and can only generate a locally optimized solution while considering a few constraints. Based on the principle that the attributions of all the measured points to geometric elements should be consistent with the ranges of recreated geometric elements (i.e., for points‐alignment consistency), a method called swing iterations is proposed to reclassify point placements and identify all the tangents, circular curves, and transition curves simultaneously.
ZSH-20 Rail curve measuring tools(20M)
For easy checking and determination of versines in track track curves .
It can be used for all common rail profiles .
Magnet type.
Model | Measuring Range | Weight | Dimension |
ZSH-20 | 20m | 153g | 113*66*26mm |