沈阳拉伸机
Your current location : Home page >> News >> Technical information

Contact

Shenyang Lubang Machinery Co., Ltd

Contact: manager Lin

Tel: 024-86922831

Fax: + 86-024-89648866

Telephone: 13998189555

E-mail: Srmf@163.Com

Postal Code: 110121

web:en.sylbjx.com

Address: Wangyi Development Zone, Shenbei street, Shenbei New District, Shenyang, Liaoning

Maintenance method of gjm-6.0 multifunctional rail finishing mill

2021-01-12 14:54:18
second

Gjm-6.0 multifunctional rail finishing mill

Maintenance method of gjm-6.0 multifunctional rail finishing mill

1. Daily maintenance

1.1 daily maintenance shall be carried out by the operator before and after operation every day. The main contents are: cleaning, lubrication, fastening and adjustment.

1.2 the daily maintenance of the engine shall be carried out according to the provisions of the operation manual of the engine.

1.3 wipe the machine completely and keep it clean, so that the metal can see the luster and the paint can see the natural color.

1.4 check all fasteners to ensure they are fully fastened without looseness or loss. Otherwise, it shall be tightened and supplemented.

1.5 fill lubricating grease at lubricating parts (grinding head) as required; Keep the transmission surface free of oil dirt, bumps and rust.

1.6 check the abrasion of grinding wheel and replace it as appropriate.

1.7 check the chain tension to make it proper. Adjust the lifting lead screw to keep the lifting flexible without jamming.

1.8 check whether the transmission parts are flexible and whether the locking device is reliable.

1.9 check the protective cover of grinding wheel to ensure that the cover is intact.

2. Regular maintenance

2.1 regular maintenance shall be carried out once every six months.

2.2 regular maintenance shall be carried out jointly by the operator and full-time maintenance personnel.

2.3 the regular maintenance of the engine shall be carried out according to the provisions of the gasoline engine operation manual.

2.4 complete all contents of daily maintenance.

2.5 check all drives and replace them as appropriate.

2.6 check whether the grinding wheel and running wheel are intact and replace them as appropriate.

2.7 check the frame for weld cracking and deformation, and repair it.

3、 Common faults and troubleshooting

Malfunction

Reason

Exclusion method

The gasoline engine cannot be started

Insufficient gasoline

Fill up with gasoline

Incorrect choke position

Appropriate adjustment

Incorrect switch position

Appropriate adjustment

The spark plug is broken

Replace or repair

The gasoline engine is unable to rotate

The air filter is seriously blocked

Proper cleaning

Carburetor dirty and blocked

Proper cleaning

Abnormal noise and excessive vibration of grinding head

Bearing failure

Replace bearing

Loose grinding wheel

Fastening grinding wheel

Warping or deformation of grinding wheel blade

Replace grinding wheel

Grinding head shaft deformation

Replace the grinding head shaft

Low rotation of grinding head

The engine is faulty

Appropriate exclusion

Great resistance to implementation

The inner bearing of the running wheel is damaged

Replace the bearing

Low grinding efficiency

Incorrect grinding wheel material

Replace grinding wheel


label

Website of this article:https://en.sylbjx.com/news/444.html
name
phone
message
Code
technical support:KaiHong Technology Liao ICP Bei No. 17001136     Sitemap | RSS | XML
Copyright © Shenyang Lubang Machinery Co., Ltd
  • Home
  • Telphone
  • Top